胡晓
电气工程及其自动化系,讲师
1985年生,于2006年和2009年在西安交通大学获得电气工程及其自动化专业的学士及硕士学位。硕士论文题目“高频局部放电检测小波阈值去噪的最优参数选取方法研究”。2009年获英国工程与物理科学研究委奖学金资助到英国思克莱德大学念博士,于2014年获得电子与电气工程博士学位,博士论文题目“高压电缆中的局部放电的有限差分时域法模拟”。自硕士以来一直从事电力设备局部放电方面的研究。在国内外重要学术期刊和会议上以第一作者和共同作者发表14篇研究论文,其中SCI收录3篇,EI收录4篇。作为第二申请人获批授权美国专利1项。作为参与人获2012年广东电网公司科技进步一等奖“大型发电机局部放电检测抗干扰关键技术研究”。目前的主要研究兴趣是电力设备绝缘的高频测试与诊断、局部放电的智能传感、暂态电磁干扰测量。
Xiao Hu
Lecturer, Electrical Engineering College
Xiao Hu was born in 1985, Guizhou, China. He graduated from Xi'an Jiaotong University with a B.Sc. degree and a M.Sc. degree in electrical engineering in 2006 and 2009, respectively. He received his Ph.D. degree from the University of Strathclyde, Glasgow in 2014 for research on FDTD modeling of partial discharge in high voltage cables. He is currently a lecturer in Guizhou University, China and his research includes partial discharge measurement and modeling.
教育经历
2009/10-2014/09,University of Strathclyde, Glasgow,Dept. of EEE,PhD
2006/09-2009/06,西安交通大学,金沙6165总站线路检测,硕士
2002/09-2006/07,西安交通大学,金沙6165总站线路检测,本科
工作经历
2016/11 - 至今,金沙6165总站线路检测,金沙6165总站线路检测,讲师
2014/10 - 2015/09,University of Strathclyde, Glasgow,Dept. of EEE,Research Assitant
科研经历
(1)贵州省教育厅青年科技成长项目,黔教合KY字[2017]102,交联聚乙烯电缆中的局部放电信号的传递函数研究,2017/11-2020/10,在研,主持。
(2)金沙6165总站线路检测引进人才科研项目,贵大人基合字(2016)09号,不同物理条件下局部放电的仿真研究,2017/01-2019/12,在研,主持。
(3)英国能源与气候变化部(DECC)资助项目,UoS8555,高压直流电缆在线监测仪(OLPD-HVDC),2013/10-2015/09,已结题,参加。
(4)英国工程与物理科学研究委(EPSRC)资助项目,EP/G029210/1,电缆状态在线监测系统中的知识挖掘 - 绝缘劣化和老化诊断,2009/06-2012/09,已结题,参加。
(5)广东电力科学研究院横向科研项目,大型水轮发电机局部放电检测的抗干扰问题研究,2006/12-2008/10,已结题,参加。
论文&专利
[1] E. Corr, A. Reid, X. Hu, W. H. Siew, M. Zhu, M. Judd, M. Seltzer-Grant and R. Giussani. “Partial discharge testing of defects in dielectric insulation under DC and voltage ripple conditions”. CIGRE Science & Engineering, N˚11:117-125, June 2018.
[2] X. Hu, W. H. Siew, M. Judd and X. Peng. “Transfer function characterization for HFCTs used in partial discharge detection”. IEEE Transactions on Dielectrics and Electrical Insulation, 24(2):1088-1096, April 2017.
[3] M. Judd, W. H. Siew, X. Hu, E. Corr et al. “Partial discharges under HVDC conditions”. Euro TechCon 2015,pages 1-19, Warwickshire, UK, Dec. 2015.
[4] M. Seltzer-Grant, R. Giussani, W. H. Siew, E. Corr, X. Hu, M. Zhu et al. “Laboratory and field partial dischargemeasurement in HVDC power cables”. 9th International Conference on Insulated Power Cables (Jicable’15), pages1-6, Versailles, France, June 2015.
[5] X. Hu, A. J. Reid, W. H. Siew and M. D. Judd. “FDTD modeling of fast transient currents in high voltagecables”. 2012 IEEE International Power Modulator and High Voltage Conference (IPMHVC2012), pages 260-263,San Diego, CA, June 2012.
[6] R. M. Harris, X. Hu, M. D. Judd and P. J. Moore. “Detection and location of arcing faults in distribution networks using a non-Contact approach”. 2012 IEEE International Power Modulator and High Voltage Conference (IPMHVC2012), pages 583-586,San Diego, CA, June 2012.
[7] A. J. Reid, X. Hu, M. D. Judd and W. H. Siew. “Defect investigation in medium-voltage EPR cable”. 2012 IEEE International Symposium on Electrical Insulation (ISEI2012), pages 323-326,San Juan, PR, June 2012.
[8] A. J. Reid, X. Hu, M. D. Judd and W. H. Siew. “Defect location and characterization in an EPR MV cable usingTDOA and thermal techniques”. In Proceedings of XVII International Symposium on High Voltage Engineering(ISH2011), pages 1094-1098, Hannover, Germany, Aug. 2011.
[9] A. J. Reid, X. Peng, X. Hu, M. D. Judd, W. H. Siew, C. Zhou and D. M. Hepburn. “Comparison of partialdischarge characteristics from insulation defects in 11kV EPR cable”. In Proceedings of XVII InternationalSymposium on High Voltage Engineering (ISH2011), pages 866-871, Hannover, Germany, Aug. 2011.
[10] X. Hu, M. D. Judd and W. H. Siew. “A study of PD location issues in GIS using FDTD simulation”. 45th International Universities Power Engineering Conference (UPEC), pages 1-5, Cardiff, Wales, Aug.-Sep. 2010.
[11] 徐阳,胡晓,杨楚明,张征平,喇元.“发电机局部放电甚高频在线监测现场试验分析”.高压电器,2009,45(2):48-52.
[12] Yang Xu, Xiao Hu, Yuan La, Zhengping Zhang and Chuming Yang. Online partial discharge monitoring system of generator and method thereof, 2012.09.18, US 8,271,213 B2. (美国专利)
联系方式
地址:贵州省贵阳市花溪区金沙6165总站线路检测西区电工楼402